I'm currently mired in black epoxy grout....there are 155 pieces in the bridge project- an unreal amount of grout! Things are looking pretty though. I am working my way through hills, rocks, waves and salmon. Next I will move on to the 100 foot long snake. I am hoping to finish around December 3rd and installation should be sometime in December.
Thursday, November 15, 2012
Lewiston Gateway Project in Progress 11.15.12
I'm currently mired in black epoxy grout....there are 155 pieces in the bridge project- an unreal amount of grout! Things are looking pretty though. I am working my way through hills, rocks, waves and salmon. Next I will move on to the 100 foot long snake. I am hoping to finish around December 3rd and installation should be sometime in December.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment